Pricing

You pay for certainty, not consultant hours

You get the audit as a one-off, by segment. First an indicative output for free, then you choose the depth. Payment by bank transfer or against an invoice.

VAT: we state prices excl. VAT and incl. VAT, so the final amount is clear before you order. Invoices are issued by M Group Holding s.r.o., which is VAT-registered; VAT at the statutory rate is added to the prices excluding VAT. The rate and the VAT status are held by the engine (assumption register, key DAN.DPH.SAZBA_ZAKLADNI, and the invoicing entity's card), not by the text on this page — who issues the documents is stated on the contact page.

How the price is built

Two independent things: segment sets the price of the automated audit, depth sets how much human work goes into it. You always start for free.

Step 1 · free

One-pager

Indicative assessment from real data — revenue stack in a low / base / high range, Critical findings, traffic light. After sign-up, no payment.

Step 2 · by segment

Audit

Full automated calculation: DCF, DSCR, scenarios, the tariffs of your distribution system. The price below depends on who you are.

Step 3 · by depth

Due diligence

A human expert reviews the engine output. A Quick check or a full DD following the SolarPower Europe methodology.

Step 2 — audit by segment

One-off, no subscription. The one-pager is always free.

Homeowner

Is a battery worth it for me?

CZK 2,490 one-time
CZK 2,490 excl. VATincl. VAT: see the amount after loading

For anyone with PV and a battery who wants to verify whether storage pays off, should be larger, or works correctly.

Free indicative one-pager after sign-up
Follow-on Quick check from CZK 29,900
Follow-on Full DD from CZK 150,000
Companies & municipalities

C&I project

CZK 4,490 / site
CZK 4,490 excl. VATincl. VAT: see the amount after loading

Manufacturers, farming cooperatives and municipalities with PV looking to add a battery.

Free indicative one-pager
Follow-on Quick check from CZK 29,900
Follow-on Full DD from CZK 150,000
Developers

Utility-scale

CZK 10,000 / MWh of capacity
CZK 10,000 / MWh excl. VATincl. VAT: see the amount after loading

Business case and due diligence for utility projects — revenue stack, DSCR, low/base/high scenarios, Critical findings.

Follow-on Quick check from CZK 29,900
Follow-on Full DD from CZK 150,000
Installers

An assessment for your customer

by project
same as the investorno discounts

Homeowner CZK 2,490 · business/municipality CZK 4,490 per site · utility CZK 10,000/MWh of capacity (min. CZK 4,490). The assessment costs the same whether the investor orders it or you do. The output names the client who commissioned it. The platform under your own brand is below.

Follow-on Quick check from CZK 29,900
Follow-on Full DD from CZK 150,000

Step 3 — due diligence depth

Follows the audit. A human takes over here — the range reflects the size and complexity of the project; we confirm the exact price before we start.

TierWhat it containsPrice
One-pager Indicative assessment from the engine. Revenue stack as a range, Critical findings, traffic light. free
Audit Full calculation: 10-year DCF, NPV, IRR, DSCR, LCOS, max. Devex, tariffs per distribution system, low / base / high scenarios. by segment
see step 2
Quick check
Light DD
Quick check per phase, Checklist table, Critical findings, go / no-go recommendation. Without a full documentation review. CZK 29,900 – 79,900
excl. VAT · incl. VAT: see the amount after loading
Full due diligence
Full DD + management summary
SolarPower Europe methodology: phases 1–5, modules M1 budget, M2 investment case, M3 ownership and maturity, M4 subsidies. Including a management summary for the investment committee or the bank. CZK 150,000 – 400,000
excl. VAT · incl. VAT: see the amount after loading

Marketplace

Brokerage

Introductions to EPC contractors, technology suppliers, aggregators and banks

1 – 3 % of CAPEX

The commission is paid by the investor or the commissioning client, never by the supplier we introduce — and only on a brokered deal. The rate depends on the scope and stage of the project. You will find the enquiry form and the partner catalogue in the marketplace (in Czech).

Subscription

Partner licence

The bessaudit platform under your brand

CZK 5,000 / month + per output
CZK 5,000 excl. VAT / monthCZK 6,050 incl. VAT / month

For installers who want neither their own software nor an analyst. For every output generated: CZK 20 per kWp of PV and CZK 10 per kWh of battery capacity, capped at CZK 25,000 per output (all excl. VAT) — CZK 310 excl. VAT for a home with 8 kWp and 15 kWh. Recalculations and sample data are free. Outputs carry your brand and the sentence that this is not an independent assessment. Billed monthly by invoice; cancellable at any time.

I want a partner licence (form in Czech) How it works
B2B API

Programmatic access to the engine and data

CZK 20,000 – 80,000 / month
CZK 20,000 – 80,000 excl. VAT / monthCZK 20,000 – 80,000 incl. VAT / month

For installers, developers and aggregators who want the business case directly in their own tools. The range depends on call volume and data scope. Monthly or annual, by invoice; cancellable at any time. API documentation.

Enquire, no obligation (form in Czech)

How you pay

🏦 By bank transfer  — payment request with a QR code and a variable symbol 🧾 Against an invoice  with 14-day payment terms (companies and municipalities with a company ID) 💳 By card  — we are adding the payment gateway, not offered yet

A proforma invoice (payment request) is not a tax document; we issue a receipt for the payment received once the funds are credited. The ordered output is unlocked once the payment is credited, not when the document is issued — even when paying by invoice. Instead of the fixed price, the investor can choose half the fixed price plus 10% of the documented saving, which they negotiate with the supplier using the assessment. The saving is the difference between two written quotes of the same scope, not the return on the project; the success fee is capped at three times the reduced fee. This does not apply to assessments commissioned by an installer (how it works). Prices are indicative per the current model and do not constitute an offer under § 1732 of the Civil Code.

Start free audit (in Czech) Sign up for free (in Czech) How it works

Is that battery worth it? Find out before you pay for it.

Enter an address, an invoice or documentation — the platform builds a business case, revenue stack and due diligence from real market data. First output free.