Home / Businesses and municipalities
Segment · businesses and municipalities (C&I)

A battery for a business pays for itself
through distribution savings, not arbitrage.

For commercial consumption, the largest share of savings comes from shaving quarter-hour peaks and a lower reserved input. That is exactly where the rules change from 1 January 2027 — and exactly what most offers do not account for.

Who it is for

Manufacturing companies, agricultural cooperatives, municipalities and towns, with or without their own PV. Typically with annual consumption from hundreds of MWh upwards, at LV or MV level. Installers come to you with an offer and you need to verify independently whether it fits.

Price
CZK 4,490 / site + CZK 200/kWh after commissioning

You pay CZK 4,490 per site when you order. A further CZK 200 per kWh of installed battery capacity is due only if you actually build the battery within 12 months of the assessment. It does not depend on what the assessment recommends, nor on any saving. Instead, you can choose half the price plus 10% of the saving you negotiate with the supplier using the assessment. Prices exclude VAT. Free one-pager; the follow-up Quick check costs CZK 29,900–79,900.

Free output
One-pager

Indicative assessment with a revenue stack in a low / base / high range and Critical findings.

How long it takes
Minutes

The calculation runs on the server over the actual 15-minute day-ahead series and ERÚ tariffs.

What we need you to enter

The form is short. Leave blank what you do not know — the platform will ask for the missing input and will not fill it in with an estimate.

What you get

What to watch out for

FAQ

We have an offer from an installer. Can you verify it?

Yes, that is the typical case. You enter the parameters from the offer and the platform calculates the saving independently, from your profile and the rates of your distribution system.

We need 15-minute data. Where do we get it?

From interval metering at the distribution system operator — the standard assumes it for metering points. Without it we calculate from a typical load profile and label the result as less accurate.

Do you also account for electricity sharing?

Yes, as a separate stream. Today's fixed allocation key undervalues sharing; a dynamic key is planned from January 2028.

What is the fee after commissioning and when do I pay it?

Only if you build a battery at the assessed site within 12 months of the assessment — whoever supplies it and whatever the assessment recommended. It is calculated from the installed capacity in kWh stated in the handover protocol or the first battery invoice; you upload the document to the member zone within 30 days of handover and we issue an invoice payable in 14 days. If you do not build, you pay nothing more.

Assess our site (in Czech) Full pricing

Your battery, audited. In minutes, not months.

Enter an address, an invoice or documentation — the platform builds a business case, revenue stack and due diligence from real market data. First output free.